Contact

WWTP: KORHOGO

28/07/2025
ETAP

Water treatment plant in Korhogo (562 m³/day)

Introduction:
The cashew nut industrial zone is an initiative of the Ministry of Agriculture of Côte d’Ivoire, located in an area with strong industrial growth potential. This zone seeks to promote the production and processing of cashew nuts, contributing to economic development and employment generation in the region.

Location:
Ivory Coast, Korhogo

Problem:

  • Presence of contaminated water in industrial processes related to cashew nuts.
  • Inadequate management of wastewater without prior treatment, which can affect the environment.

Solution:

  • Installation of a Wastewater Treatment Plant (WWTP) with physicochemical and biological treatment to ensure that the effluent complies with environmental and sanitary limits.
  • Optimization of the treatment process to adapt it to the characteristics…

Results:

  • Treated water of sufficient quality to be discharged into the natural environment without harming local ecosystems.
  • Improved waste management and compliance with current environmental regulations.
  • Positive contribution to the sustainability and environmental responsibility of the industrial area.

Key data:

  • Treatment capacity of 562 m³/day.
  • Adaptation of the treatment to the particularities of the cashew nut industry wastewater.
  • Significant reduction of environmental impacts derived from industrial activity.

other Projects

ETAP
GAZELIA GAZELIA WWTP 720 m3/j
01/08/2025
ETAP
STEP SIKASSO REPAIR OF S7-1200 CONTROLLER
01/08/2025
ETAP
Modular DWTP 40 m3/day
01/08/2025

Talk to one of our technicians.

Contact us
Aragon
Project
Year
Alicante
Proyecto
Año
Lebanon
Project
Year
BEKAA EDAR Beirut 250 Persons, 12.5 m3/Day
2014
MALI
Project
Year
GAZELIA GAZELIA WWTP 720 m3/j
2018
STEP SIKASSO REPAIR OF S7-1200 CONTROLLER
2018
SPAIN
Project
Year
AGRARIA DE MONTOLIU ETAF IL1500 ILERDAGUA FRUIT WASHING FINAL OF
2025
SAT VIDRE ETAF – HYDROCOOLING 40 m3
2025
BULGARIA
Project
Year
AQUAVAL DESNITRIFACDOR 7 m3/h modular container
2025
FRUCTO ETAF IL1500 – FRUIT WASH
2025
Ivory Coast
Project
Year
SEGUELA WWTP SEGUELA 350 m3/j
2024
YAMOUSSOUKRO STEP YAMOUSSOUKRO PROCESO ILERDAGUA 560.4 m3/j
2020
CAMEROON
Project
Year
Modular DWTP 40 m3/day
2014
Peru
Project
Year
Leimebamba Water treatment plant DWTP, 60 m3/h October 2020
2020
Cuba
Project
Year