ETAF: Drinking water treatment plant

22/07/2025
ETAF

Water treatment plant:

Introduction:
In the process of washing the fruit in the processing tanks, the water used is quickly contaminated with organic and inorganic matter, thus affecting its quality. To ensure optimum quality of the water used for this process, the water is continuously renewed. ILERDAGUA proposes a water treatment and recirculation system, thus reducing total water consumption and ensuring that it is free of solids and complies with health parameters.

Location:
Lleida, Catalonia, Spain

Problem:

  • High degree of contamination in the water of the fruit washing ponds.
  • Very expensive treatment, very high dosages.
  • Continuous renewals that involve high consumption.

Solution:

  • Recirculation and continuous water treatment: keeps the water clean and in optimal conditions for long periods of time.
  • Removal of solids and low turbidity: allows a more efficient and safer disinfection.
  • Drastic reduction of water consumption: minimizes waste and optimizes resources.

Results:

  • Reliable system that removes organic and inorganic matter.
  • Efficient operation with low energy consumption.
  • Flow rate adapted to demand.
  • Precise flow control.

Key data:

  • Significant reduction in water consumption.
  • Increased periods between water changes up to 2 months.
  • Significant water savings per pond per week.

other Projects

ETAP
GAZELIA GAZELIA WWTP 720 m3/j
01/08/2025
ETAP
STEP SIKASSO REPAIR OF S7-1200 CONTROLLER
01/08/2025
ETAP
Modular DWTP 40 m3/day
01/08/2025

Talk to one of our technicians.

Contact us
Aragon
Project
Year
Alicante
Proyecto
Año
Lebanon
Project
Year
BEKAA EDAR Beirut 250 Persons, 12.5 m3/Day
2014
MALI
Project
Year
GAZELIA GAZELIA WWTP 720 m3/j
2018
STEP SIKASSO REPAIR OF S7-1200 CONTROLLER
2018
SPAIN
Project
Year
AGRARIA DE MONTOLIU ETAF IL1500 ILERDAGUA FRUIT WASHING FINAL OF
2025
SAT VIDRE ETAF – HYDROCOOLING 40 m3
2025
BULGARIA
Project
Year
AQUAVAL DESNITRIFACDOR 7 m3/h modular container
2025
FRUCTO ETAF IL1500 – FRUIT WASH
2025
Ivory Coast
Project
Year
SEGUELA WWTP SEGUELA 350 m3/j
2024
YAMOUSSOUKRO STEP YAMOUSSOUKRO PROCESO ILERDAGUA 560.4 m3/j
2020
CAMEROON
Project
Year
Modular DWTP 40 m3/day
2014
Peru
Project
Year
Leimebamba Water treatment plant DWTP, 60 m3/h October 2020
2020
Cuba
Project
Year