Contact

Ilerdagua management and services

Communities

Advanced water treatment solutions

Replacement of fiber cement tanks with customized polyester tanks
We replace old fiber cement tanks with custom-made reinforced polyester tanks of our own manufacture. A safe, durable solution adapted to each community or community. We take care of the whole process: dismantling, removal, waste management and installation of the new tank.
Tank cleaning
Cleaning service with hyperchlorination to guarantee safe water free of microorganisms. Installation of PVC and fiber tanks for human consumption, with safe, corrosion-resistant materials and in compliance with sanitary regulations.
Installation and maintenance of booster sets
We guarantee an efficient and safe supply. We offer customized designs, periodic inspections, preventive and corrective maintenance and technological upgrades to improve efficiency and energy savings.
Installation of telematic meters
Installation of meters with remote reading to control water and energy consumption in real time. They allow generating customized reports, optimizing resources, reducing costs and ensuring regulatory compliance. Wireless system with continuous technical support.
Plumbing, repair and replacement of community supply and drainage pipes.
Repair and replacement of supply and drainage pipes with technology to detect leaks and minimize interruptions. Includes preventive maintenance, regular inspections and solutions tailored to each community. Promotes water savings and safety.
Waterproofing
Professional solutions to prevent leaks in tanks, terraces and other structures. We use high quality materials and adapted techniques to protect against moisture and extend the life of surfaces. We also cover basements, swimming pools and decks.

Talk to one of our technicians.

Contact us
Aragon
Project
Year
Alicante
Proyecto
Año
Lebanon
Project
Year
BEKAA EDAR Beirut 250 Persons, 12.5 m3/Day
2014
MALI
Project
Year
GAZELIA GAZELIA WWTP 720 m3/j
2018
STEP SIKASSO REPAIR OF S7-1200 CONTROLLER
2018
SPAIN
Project
Year
AGRARIA DE MONTOLIU ETAF IL1500 ILERDAGUA FRUIT WASHING FINAL OF
2025
SAT VIDRE ETAF – HYDROCOOLING 40 m3
2025
BULGARIA
Project
Year
AQUAVAL DESNITRIFACDOR 7 m3/h modular container
2025
FRUCTO ETAF IL1500 – FRUIT WASH
2025
Ivory Coast
Project
Year
SEGUELA WWTP SEGUELA 350 m3/j
2024
YAMOUSSOUKRO STEP YAMOUSSOUKRO PROCESO ILERDAGUA 560.4 m3/j
2020
CAMEROON
Project
Year
Modular DWTP 40 m3/day
2014
Peru
Project
Year
Leimebamba Water treatment plant DWTP, 60 m3/h October 2020
2020
Cuba
Project
Year